After the rain stopped, vehicles started moving on the BP highway – Online Khabar rohanmandal.com.np

April 1, 2026


18 Chait, Kavrepalanchok. After the rain stopped, traffic on the BP highway has resumed. District Police Office Kavre Chief SP Komal Shah informed that traffic has been resumed as the rain has stopped since Tuesday evening and the risk has reduced.

After heavy rain in Panauti, Namobuddha, Dapcha areas from 7 pm on Tuesday, traffic operations were suspended in Chowkidanda-Nepalthok section keeping in mind the risk of rain. After the rains stopped, the vehicles kept on hold in Kavrevanjyang and Nepalthok have been operated.

As the BP highway is under construction, from Chowkidanda to Nepalthok, a temporary diversion has been made in the Roshi river and the means of transport have been operating.

Source link

Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *